Main.DhR 20 Apr 2009 BASS 4/15/09 sbp, st, der, pr, ef ef looking at startup drifts last week many interruptions, this week quick startup. would like to put...
Main.DhR 19 Feb 2009 Beam Alignment and Stability Study Structure Objectives: 1. Study factors determining reproducibility of CHESS photon beam alignment with ...
Main.DhR 14 Apr 2009 BASS meeting 4/1/09 sbp, ef, dr, pr, st sbp planning to reinstate logging of psitions from cbpm system don' tread out non existing bunch....
Main.DhR 25 Feb 2009 Beam Alignment and Stability Study 2/18/2009 sbp, eff, dr, pr, st, dhr Reports from work since the first meeting: Dana talked with Jim...
Main.DhR 19 Feb 2009 Beam Alignment Stability Study 2/3/2009 EFF, SBP, PR, DER, DHR, ST Reviewed study group objectives improve predictability of CHESS phot...