- Set ICM SLAC power supply to 0 kV, wait 20 minutes while it ramps down, then turn SCR off.
Break interlocks
Remove ropes / signs
a) L0/L0E entrance
b) Bridge of Spurgen
c) Top of Stairs
e) MLC Underpass
2K Phase Heater at 0 W
Open pump kid valves, to 6 turns
Command klystrons to 0
Run turn-off script
Turn off gun switch
Lock up ERL PPS light beam reset key