PRE-BEAM COMMISSIONING
- SYSTEMS COMMISSIONING:
- Splitter magnets (David Burke and Jim Crittenden):
- Elytt magnets (David Burke):
- Power supplies connections
- Water cooling systems – plumbing
- EPICS name definitions
- Hall probe testing – transfer function confirmation
- Hysteresis corrections tests
- 4 SEPTA-1 (David Burke and Jim Crittenden):
- Septum 1 – assembly
- Septum 1 magnet measurements
- Septum 1 installation (four septa) and survey
- Water cooling plumbing
- Power supply connections
- Septum 1 hall probe testing
- 4 SEPTA-2 (David Burke and Jim Crittenden):
- 8 Coils production at BNL
- 4 Septa 2 assembly
- Magnet measurements at BNL – Hall probe scan
- Septa 2 installation and survey
- Water cooling plumbing
- Power supply connections
- Polarity and strength test with the Hall probe
- The S4 and R4 long quadrupoles (David Burke and Jim Crittenden):
- Two quadrupoles assembly and survey
- Power supply cable connection
- Water cooling plumbing connections
- One magnet shipment to BNL for magnetic measurements
- Quadrupole installation and survey
- Polarity and strength Hall probe testing
- H5 magnets (David Burke and Jim Crittenden):
- C-magnet magnet assembly
- One magnet to be shipped to BNL and measured at SMD
- Magnet installation and survey
- Power supply cable connections
- Water cooling
- Polarity and strength Hall probe test
- BPM’s (Robert Michnoff)
- Cable preparation
- Boards installation
- EPICS names
- Network
- Testing
- Scripts for timing the BPM system
- CBETA EQUIPMENT PROTECTION System (Nilanjan Banerjee and John Dobbins)
- Completion of the review and documentation
- Final pre-beam testing
- Beam Arrival Monitors (BAMs) (Rob Michnoff and John Dobbins)
- Installation
- Boards at the Cornell Electronic Shop
- Testing
- Fast Loss Monitor system (Nilanjan Banerjee, Rob Michnoff and John Dobbins)
- Electronic boards
- Installation
- Cables
- Hamamatsu detectors installation and testing on the floor
- CBETAV (Colwyn Gulliford and David Sagan)
- EPICS names correspondence to the model names
- Time of flight and M56 adjustments
- Orbit corrections (are the survey data placed into the model?) and beam position measurements scripts
- Dispersion measurement scripts
- Matching the Splitter lines to the FFA scripts
- Orbit response scripts predictions
- Main Linac Cryomodule (Peter Quigley, Nilanjan Banerjee, Vadim Vescherevich)
- Earlier Cooldown
- Cryogenic control loop tuning optimization
- Cavity Q0 measurements will help optimization of the load leveling
- Control loops optimization under the load
- Vibration sources require isolation
- Acoustic piezo feedback upgrade
- Wave guides upgrade
- Amplifiers improvements
- Laser system upgrade at the gun for different bunch patterns configurations (Adam Bartnik)
- Installation of the new laser shutter.
- Circular buffer tuning
- Sliding Joints in the middle of the splitter lines commissioning (David Burke)
- Beam view screens – beam profile monitors (Karl Smolenski and John Dobbins)
- Camera testing
- Inside – outside position testing with the control system
- Control system (Adam Bartnik, Colwyn Gulliford, Kirsten Deitrick and John Dobbins)
- EPICS names
- Network connections
- Testing the communications
- FFA - Fixed Field Alternating Fixed Gradient correction system (Colwyn Gulliford, Adam Bartnik, Stephen Brooks, Nick Tsoupas)
- Hall probe testing (Rob Michnoff)
- Surveying by the BNL team magnet position re-check
- Water cooling system check
- Bunch pattern generator system (Adam Bartnik, and Robert Michnoff)
- Testing together with the laser system
- Testing the BPM response
- BNL Cathode transport (Karl Smolenski and Adam Bartnik)
- Dump line shielding (Karl Smolenski)
- Gun and laser system commissioning (Adam Bartnik)
- Injector system commissioning in September (Adam Bartnik, Kirsten Dietrick, Colwyn Gulliford, and Scott Berg)
- MLC recommissioning (Nilanjan Banerjee, Peter Quigley, and Scott Berg)
Topic revision: r1 - 08 Oct 2019, trbojevic