Operator on Shift:qBEFORE Open Access begins, close all Secondary Gate ValvesqBEFORE Open Access ends, verify tunnel lights are off at C, D, F lines and G cave and all doors on Terranova racks in tunnel are closedqDURING White Key Access, open all secondary gate valvesSignals for the past week: (complete during OWL shift)qAll 7 Day ButtonsqNote Any Missing SignalsqPrint out plots of suspicious signals for distribution to the appropriate personAt Each Station and G-Cave:qLook for badges, forms, parking permits, burn paperqMove 2 occupied area badges from A1 user area to badge rack at OpsqPrint out motor positions at each station, ops, and G-cave(prout we) & add printouts to binder in OpsqCheck kapton window in A1, mylar window in F1 and replace if necessaryqCheck kapton window at I0 in F1 and replace if necessaryqCheck detector chiller fluid level in F2, and GE and Pilatus detectors if being used. Top off when necessaryIn the Tunnel: (complete by 10am)qVacuum/clean around ends of undulator magnets (4 spots)qRecord D-line beamstop counter in vacuum labbook conference on webboardqWater leaksqIon pump controllersqLoose wiresqOther obvious problems (look and listen)qLook for missing bus/magnet covers, alert CESR operator and post webboard and ELOG notes.qTurn off lights by C, D, and F lines and close all tunnel electronics racks as you goAt OperationsqOn EPICS Monitors:qCheck for T.C. failures/overtempqCheck for ion pump tripsqCheck for disconnected signals/any other errorsqRemove group dosimeter log sheets weekly and individual dosimeter log sheets when they are full from binder, give to Dwight WidgerqEnsure broken equipment bench in ops is empty by either fixing equipment or giving to appropriate staff to fixqVacuum computer fans & electronicsMisc. StuffqInventory Radiation SourcesqGlovebox: Check display screen for any alerts or alarms (box normally operates between 1-5mbar). Report anything suspicious (unlabeled vials, spilled materials, etc)qCheck ice machine in cold room break up/empty out large chunks as necessaryqCheck chem. rooms for obvious problemsqRun water through eye washes until it is clear.4 locations: G line chem room, main chem room, CHESS Ops, room off of F1qCheck door intercoms (5th floor and loading dock)qClear clutter from Ops/Prep area and experimental floorF2 Cryo SystemqCheck drip pans and buckets on East roof; empty as necessaryPost all of your findings to the Webboard
-- LeeShelp - 20 Feb 201