
NSF Annual Review 2025
July 10(???), 2025
Welcome to the project information repository for the NSF MREFC 2024 Annual Progress Review.
NEED TO UPDATE ATTACHMENT HERE Charge to the NSF Review Panel [Doc DB - 14728]
NEED TO UPDATE ATTACHMENT HERE Agenda [Access key sent separately via email to committee members]
Access to documents requires a CERN lightweight account. Information about how to obtain a CERN lightweight account was distributed to reviewers by email, along with a file containing copies of all the documents linked below. If you need any assistance, please contact Steven Cullen at stc93@cornell.edu
This Document Guide provides a brief overview of the documents and the charge questions they address.
to ensure that you get the most updated material. We may have recently uploaded new documents.
Topic 1: Project Plans
- Abbreviations and Acronyms [Doc DB - 13454]
- NSF Project Execution Plan [Doc DB - 13279]
- Key Assumptions [Doc DB - 12919]
- Cost Estimating Plan [Doc DB - 13256]
- Quality Assurance Plan [Doc DB - 13093]
- Systems Engineering Management Plan [Doc DB - 13194]
- Cooperative Agreement for the HL-LHC MREFC [Doc DB - 14311]
- Configuration Management and Change Control Plan [Doc DB - 12907]
Topic 3: Technical
- Science Goals and Requirements [Doc DB - 13337]
- 402.3 Barrel Calorimeter -- Requirements and Interfaces [Doc DB - 13317]
- 402.5 Endcap Muons -- Requirements and Interfaces [Doc DB - 13281]
- 402.7 Forward Pixels -- Requirements and Interfaces [Doc DB - 13304]
- 402.6 and 402.9 Trigger and DAQ -- Requirements and Interfaces [Doc DB - 13318]
Topic 4: Cost
Topic 5: Schedule
- Project Schedule -- Summary Views [Doc DB - 13399]
- P6 Schedule (Gantt) [Doc DB - 13245]
Topic 6: Risk
- Risk Register (NSF scope) [Doc DB - 12897]
- Risk Management Plan (MREFC scope) [Doc DB - 13408]
Topic 7: Change Control and Reporting
- Monthly Reports (NSF scope) [Doc DB - Topic - 775]
- Monthly Institute EVM Performance [Cornell Box Folder]
- Baseline Change Control Log [Doc DB - 13881]
- NSF MREFC Baseline Change Requests [Doc DB - Topic - 857]
Topic B: Standard Procedures and Guidance
- Fermilab Office of Project Support Services documents [Doc DB - 14307] - including the following documents:
- Fermilab Office of Project Support Services documents
- Fermilab Project Procedures #1: WBS, OBS, RAM
- Fermilab Project Procedures #2: Control Accounts, Work Packages, Planning Packages
- Fermilab Project Procedures #3: Work Authorization
- Fermilab Project Procedures #4: Project Scheduling
- Fermilab Project Procedures #5: Cost Estimating
- Fermilab Project Procedures #6: Monthly Status Reporting
- Fermilab Project Procedures #7: Change Control
- Fermilab Project Procedures #8: EVMS Surveillance and Maintenance
- Fermilab Earned Value Management System certification letter
- Fermilab Risk Management Procedures for Projects
Topic C: Previous Reviews
- FDR Final Report [DB - 13905]
- Project Response to FDR Recommendations [DB - 14309]
- Rebaselining Final Report [DB - 14612]
- Project Response to Rebaselining Recommendations [DB - 14736]
- May 2024 P2UG Upgrade Review [DB - 14735]
Logon or Register Topic AnnualReview2025: Edit, WYSIWYG edit, Attach, Raw view, Revisions, Printable, More topic actions
Revision r1 - 27 Mar 2025 - 11:16:38 - StevenCullen
I | Attachment | Action | Size | Date | Who | Comment |
---|---|---|---|---|---|---|
![]() |
NSF_Logo.png | manage | 15 K | 27 Mar 2025 - 11:08 | StevenCullen |